Distribution Centre PV

CPS completed the full design, construction, installation, and commissioning of a ground mounted Solar Photovoltaic system for our valued client. Following in depth ground condition surveys and structural analysis, a bespoke screw pile system was designed and installed to support the framework for the solar panels. In accordance with strict localised planning stipulations solar panels were installed onto the frame ensuring full compliance with all limitations within the planning conditions. The solar PV system was interlinked to the existing “on roof” solar PV array, existing onsite backup generators, and fire alarms systems to give the client complete control of the site wide systems ensuring rapid shutdown of any element that would affect another. CPS also completed all building work in connection, electrical works and minor air treatment works.