linkedin

CPS Building Services

01223 232054 | info@cpsbuildingservices.co.uk

MENU menu

Close close menu

CONCEPTION AND DESIGN

 

CPS has extensive experience of Design and Build projects across East Anglia. We have design capability from RIBA Stage 2 (Preparation and Brief) to Stage 7 (the ‘In-Use’ phase) ), you can rely on us to steer a project from conception to handover – and then beyond. We aim to be a one-stop solution for our customers.

 

Collaborative and open

The CPS design philosophy is rooted in collaboration and trust, because we believe that projects run smoothly when everyone is working with the same objectives. To this end, we run regular workshops to keep our clients involved in the design decisions. We use live cost management to keep the projects on budget. We also offer advanced Building Information Modelling (BIM) when required. Three-dimensional modelling is a highly effective tool at demonstrating to our clients the exact end product they will receive. BIM modelling it is a great tool at keeping everyone informed about all aspects of the design. CPS have a proven track record of using BIM modelling to great success through pre-fabricating and modularising offsite solutions for our clients.

 

Focused on our customers

One of the great advantages of Design & Build is its clear, consistent focus on the end result. At CPS we think this is vitally important, because the ultimate purpose of a building is to serve the people who will use it every day. One way we do this is by using our wide-ranging product knowledge to identify the kinds of innovative, eco-friendly technologies that will create the very best long-term savings. But it also means avoiding technology for technology’s sake: nobody should overspend on complicated systems that won’t be used by the eventual occupants. Our design strategy also seeks to reduce disruption wherever possible; by designing, building and installing components that have been prefabricated by our own Engineers, we can speed up the construction process and keep on-site disturbance to a minimum.

CUSTOMER ENQUIRY

Enter your details here:

"CPS were a pleasure to work with and, as a consequence of their overall performance, I have already employed them on a number of other projects. I am also recommending them to other colleagues, Colleges and companies."
Trevor Smith, Head of Facilities and Estates, Cambridge Regional College
"I have to say that you have such an excellent team there. We are completely delighted with all the work that has taken place here, there is no fuss, no bother and no mess. Everyone is polite, respectful and professional."
Doreen Houghton, St Bedes School
"CPS carried out the works quietly and efficiently with little or no inconvenience to anyone. The College staff found them very easy to deal with and the finished job is superb.We have enjoyed excellent relations with CPS for many years now (going back to shortly after they started out) and I have no hesitation in recommending them."
Phillip Law, Operations Manager, Downing College
"CPS has responded well to queries throughout the project and has provided an excellent aftercare service reacting promptly to any issues that have arisen. It is without doubt that the University looks forward to working with CPS Building Services on future projects."
Martin Badcock, Mechanical Energy Engineer, Cambridge University Estates Management
"A very good quality project, fitted to a very high standard. It has been a pleasure working with you all and I look forward to working together in the near future."
Matthew Smith, Bidwells Building Consultancy
"I am really pleased that we managed to have the heating system filled and bled and ready for the boilers to be started... as planned and advised. Thank you to everyone involved, especially those working evenings, nights and weekends."
Richard Phillips, Cambridge University Estates Management
"...the level of service has been exemplary, and your fast response to our call-outs has enabled the college to function without inconvenience to the staff or pupils."
Barry Norman, Impington Village College
"Heating a medieval church for modern comfort is a very difficult thing to do. CPS designed and installed a system that is flexible and remarkably responsive."
Rev Madeleine Light, St Stephens Church