St Bedes School Boiler Room
CPS Building Services carried out the refurbishment of both the Main and Block B boiler rooms at St Bedes school. This included the removal of all existing plant, pipework and control and replacing with new boilers, water heaters, pipework, valves and controls. All replaced whilst maintaining heating & hot water via our temporary boiler plant.