St Johns College - Bridge Street

St Johns College - Bridge Street

Mechanical  & Electrical Services Project

 

St Johns College approached CPS Building Services regarding refurbishing their Bridge Street boiler house. CPS produced a cost plan for these works and then employed BSD Consulting to produce design and three dimensional drawings.

 

CPS prefabricated all the pipework offsite and completed the whole boiler room installation in 6 weeks. Temporary hot water to the student accomodation was provided during the project. Each new circuit within the boiler room had an Xpot installed to help with future maintenance. CPS managed the replacement of the BMS controls, thermal insulation, balancing, flue, scaffolding and water treatment subcontractors to ensure this tight programme was acheived for the St Johns College. 

KEY FACTS

LOCATION: Cambridge

MAIN CONTRACTOR: St Johns College

PROJECT VALUE: £650,000

 

DISCIPLINES

  • BMS Controls
  • Flue Installation
  • Gas Pipework
  • Lighting
  • LTHW Heating
  • Replacement Boiler System
  • Services Strip Out
  • Small Power & Lighting
  • Thermal Insulation
  • Water Treatment