linkedin

CPS Building Services

01223 232054 | info@cpsbuildingservices.co.uk

MENU menu

Close close menu

ADDED VALUE

 

At CPS we offer our customers a service they will not find anywhere else in the services sector. We differentiate ourselves from the competition by adding value to our clients though a range of services. It’s about providing products and processes for our customers that go beyond the norm, to drive down costs and timescales – without impinging on quality. We do this in a number of ways:

 

Temporary Boilers

CPS’s temporary boiler capability is an essential part of the service. We have our own fleet of portable boiler systems that provide replacement heating and hot water at short notice, usually deliverable within 24 hours of breakdown. This can be vital in emergency situations, if equipment fails and services need to be restored as quickly as possible. But it’s also a major advantage when it comes to pre-planned construction work. With a reliable stand-in system taking the strain, we can get on with the job in hand: stripping out the old parts, designing and manufacturing a new system, and then installing it – all with the least possible disruption to your workforce, facilities or business.

 

Prefabrication

We prefabricate our M&E products off-site wherever possible. . This provides a number of key benefits. It ensures quality and safety, as the manufacture of these products takes place in a controlled environment with strict quality assurance procedures. By reducing on-site labour and eliminating delays, it also greatly speeds up the programme – sometimes halving the time it would take to do the same work on-site, this means these savings can be passed to our clients giving them value and ultimately cost certainty.

 

One-Stop Contracting

Though our historical roots are in mechanical installations, today CPS operates as a wide-ranging building services company. As such, we often act as the Principal Contractor for our clients, handling everything from the design and installation though to the handover of the completed project and then the ongoing maintenance. From a customer’s perspective, this has several clear advantages. Firstly it provides a single point of contact on a project rather than multiple personnel across multiple companies; a dedicated Construction Manager oversees the day-to-day running of the programme and keeps you updated on progress. Secondly, it reduces costs by avoiding the chain of mark-ups that inevitably happens when companies parcel up the construction elements and subcontract them out. CPS is a one-stop solution for your project.

CUSTOMER ENQUIRY

Enter your details here:

CASE STUDIES

RAF Alconbury
RAF Alconbury
Babraham Research Institute
Babraham Research Institute
"CPS were a pleasure to work with and, as a consequence of their overall performance, I have already employed them on a number of other projects. I am also recommending them to other colleagues, Colleges and companies."
Trevor Smith, Head of Facilities and Estates, Cambridge Regional College
"I have to say that you have such an excellent team there. We are completely delighted with all the work that has taken place here, there is no fuss, no bother and no mess. Everyone is polite, respectful and professional."
Doreen Houghton, St Bedes School
"CPS carried out the works quietly and efficiently with little or no inconvenience to anyone. The College staff found them very easy to deal with and the finished job is superb.We have enjoyed excellent relations with CPS for many years now (going back to shortly after they started out) and I have no hesitation in recommending them."
Phillip Law, Operations Manager, Downing College
"CPS has responded well to queries throughout the project and has provided an excellent aftercare service reacting promptly to any issues that have arisen. It is without doubt that the University looks forward to working with CPS Building Services on future projects."
Martin Badcock, Mechanical Energy Engineer, Cambridge University Estates Management
"A very good quality project, fitted to a very high standard. It has been a pleasure working with you all and I look forward to working together in the near future."
Matthew Smith, Bidwells Building Consultancy
"I am really pleased that we managed to have the heating system filled and bled and ready for the boilers to be started... as planned and advised. Thank you to everyone involved, especially those working evenings, nights and weekends."
Richard Phillips, Cambridge University Estates Management
"...the level of service has been exemplary, and your fast response to our call-outs has enabled the college to function without inconvenience to the staff or pupils."
Barry Norman, Impington Village College
"Heating a medieval church for modern comfort is a very difficult thing to do. CPS designed and installed a system that is flexible and remarkably responsive."
Rev Madeleine Light, St Stephens Church
"Much appreciated and thank you for helping us to produce a miracle over the summer holiday. Couldn’t have been done without you and your guys. They were all great."
Phil Woods, P Woods Construction